Glyndebourne Opera house outdoor stage

Client

Glyndebourne Productions

Brief

Initial brief was to install anchors for the outdoor staging structure with the aim to provide a counter balance for the the stage to be secure in a variant of weather conditions.

Challenges

Achieving the required loads ensuring the structure would be capable of withstanding the max wind speeds was the remit for spirafix anchors. These loads were determined by a structural engineer which allowed both Spirafix and Glynbourne to proceed with specification of the structure and anchoring system.

Solution

16 number SF50-10-0840C type anchors along with the Spirafix SA693 scaffold bracket were installed after pull testing confirmed the required loads had been met. Spirafix site team complete the anchor installation allowing Glyndebourne productions to complete their scaffolding structure on time for their dress rehearsal.

Latest News

Helping Secure the Culture Industry to the Ground

From your local music venue to the nation’s leading performance…

We are Open for Business and are Here…

As we see the country slowly getting back to some…

The Importance of Using Spiral Ground Anchors With…

With children spending all their time at home now, (and…