Projects

Glastonbury Music Festival

Client

Glastonbury Music festival

Brief

Since 2014 Spirafix ground anchors have been called to Glastonbury site before each event to conduct site load testing in specific locations. This initial requirement stemmed from the their current working method (Concrete counter ballast), which was destroying the ground when the ballasts were being put into position and the environmental impact of a large truck deploying the counter ballasts needed.

Challenges

With the testing locations being of paramount importance the Glastonbury team indicates where on the site their require the testing to be undertaken. It is then down to the Spirafix site installers to find the weakest ground in the designated area.

Solution

Three tests are complete with each size anchor on each site to ensure and average load can be found. The results logged, data is taken back to Spirafix HQ for processing. A site report is then generated displaying the results and sent to the Glastonbury site team to make avaialble to the sub contractors setting up their temporary structures on site.

Latest News

Using Ground Anchors in Tarmac

Spirafix Ground Anchors are perfect for use in a wide…

How Can I Secure my New Event Tent…

With more coronavirus restrictions in place, there’s an emphasis on…

Spirafix Goes International

We are Spirafix, a UK ground-anchor specialist with a solid…